Pages

Saturday, March 3, 2012

I am ashamed to say I had something of a freakout yesterday. In January, we had spoken to my neighbor, Paul, about an amazing built-in unit for our study, incorporating desk, storage, TV and improving the looks tremendously. Paul does great work; he's very careful. The downside is it often takes longer than expected. He assured me that it would only take about a week to do this and could be done before the wedding. Yesterday morning he called to tell me he wouldn't be able to start it until April. I was really angry and disappointed and I took it out on Ray. All the stuff from that room is piled up in the guest room and I need to figure out what to do with it. Ray suggested renting a storage unit and I was not pleased. Also, Ray was leaving for the weekend and I am worried about his hip, as well as missing him a lot.


I drove him to his office with his sleeping bag and the cooler full of breakfast food and other travel items. On my way home, I stopped at a used furniture store and looked at what they had. Nothing that would work for the TV room. At home, I spent time on the computer, ate lunch, talked to my sisters...My Dad arrived, I made more quiches.

Looked at furniture with Becky and had a lovely dinner at speak Easy--including a Mojito and a Fallen Chocolate Cake. Yum.

Storms in the night and over 2 inches of rain by 8.

No comments:

Post a Comment